Nadín's Frustration: When the Timings Don't Add Up
Imagine Nadín, operations manager at a distribution company, desperately reviewing his planning. "I take 5 days in P and 5 days in out, so I want to schedule my outs for 5 days," he explains with frustration. His problem is common: delivery lead times don't line up with operational reality, causing delays that hurt customer satisfaction and internal efficiency. This situation, which many companies face every day, has a solution once the planning tools are properly understood and configured.
Understanding Delivery Lead Times in Odoo
Delivery lead times are the backbone of logistics planning in Odoo. When we sell a product, the system lets us set a committed delivery time for the customer. This deadline is crucial because it triggers all subsequent actions: scheduled dates are created, propagated, and deadlines are defined in cascade backwards through the process.
Practical example: A drone sales company sets its standard delivery lead time at 10 days. Instead of configuring each sale manually, they define this lead time directly on the product. That way, every time a salesperson adds this drone to a quotation, Odoo automatically calculates and propagates the dates needed to meet that commitment. Companies that work with Ganemo implement this automation from day one, ensuring that all lead times are calculated consistently.
The golden rule: plan backward from the deadline
One of the most important and frequently misunderstood concepts is the direction of planning. Many users believe they should calculate dates from the start of the process forward: "if it takes me 5 days to buy and 5 days to manufacture, then my delivery will be in 10 days." This logic is incorrect in Odoo. Correct planning works backward from the delivery deadline: "if I must deliver on January 10, when do I need the picking ready? And when should production start?"
Real case: A furniture manufacturer had constant delays because it planned from the production start date. After reconfiguring with Ganemo, they learned to work from the committed delivery date. Now, if a customer requests delivery for the 15th of the month, the system automatically calculates that the picking must be ready by the 10th and production must start on the 5th, considering the actual times of each stage.
Configuring specific times per operation
Odoo's true power shows when we configure specific times for each type of operation. A general delivery lead time isn't enough; we must define how long each step of the process takes: picking, packing, delivery, etc. This allows the system to plan each activity realistically and in advance.
Concrete implementation: An electronics distributor found that its picking process took 2 business days, while packing and shipping preparation took an additional day. After configuring these times in Odoo with Ganemo's help, the system began alerting 3 days in advance when an order needed to be prepared to meet the delivery date. This eliminated last-minute rushes and significantly improved its operational efficiency.
The crucial difference between scheduled date and deadline
It's essential to understand that scheduled date and deadline are different concepts, though related. The scheduled date is the operational plan that can be adjusted based on actual execution. The deadline represents the commitment to the customer and should not change except in exceptional circumstances.
Illustrative example: A logistics company had constant confusion because its teams saw different dates on different screens. After implementing with Ganemo, they learned that the January 7 deadline meant "deliver no later than the 7th," while the January 5 scheduled date meant "prepare the picking for the 5th." This clarity eliminated misunderstandings and improved coordination between departments.
Automation: the key to consistency
Automating lead times is not a luxury but a necessity for any company that wants to scale without increasing errors. Setting lead times directly on products ensures that every transaction automatically inherits the correct planning, eliminating dependence on human memory or manual processes prone to errors.
Success story: A retailer with multiple stores struggled because each branch handled different delivery lead times. By standardizing the configuration in Odoo with Ganemo's support, they not only unified their processes but also reduced delays by 70%. Now, when a product has a 10-day lead time, all stores, all salespeople, and all systems work with the same expectation and planning.
Conclusion: from frustration to full control
Nadín's initial situation represents a common but completely solvable problem. By understanding and correctly configuring delivery lead times in Odoo, companies transform their supply chain from a constant source of stress into a competitive advantage. Planning backward from the deadline, configuring specific times per operation, and automating these parameters are the keys to meeting customer commitments every time and operating with maximum efficiency. Companies that choose to implement with expert partners like Ganemo not only solve these problems but build solid foundations to grow in an orderly and predictable way.